Location: Between 10 Mile Road and Stephens - Warren
Concrete Contractor & Supplier: Florence Cement Company
Project Owner: City of Warren
QA/QC Consultant: G2 Consulting
The scope of the Warner Avenue Reconstruction project was to install new concrete pavement on Warner Avenue from 10 Mile Road to Stephens along with watermain relocation, minor storm sewer improvements, and edge drain installation.
The project was started with completing the underground work for storm and watermain. The road was constructed partial width, westbound and then the eastbound side to allow residents access to homes throughout the duration of the project.
Florence Cement was able to use the baseball field at adjacent Westview Elementary School for a temporary batch plant to produce the required 16,284 square feet of concrete sidewalk, ramp, and drive approaches, as well as the 14,715 square feet of 9-inch thick, non-reinforced, concrete pavement.
Poor roadway subgrade and aggregate base soils presented a challenge and required undercuts and replacement with engineered aggregate base.