Stillwater Crossing features newly-built single-family homes ranging from 2,000 to 3,000 square feet and is conveniently located near a variety of attractions in Macomb County, including Partridge Creek and Lakeside malls, Lake St. Clair, the renowned International Academy of Macomb, and the Macomb Township Recreation Center, along with numerous restaurants, parks, and golf courses.

Phase 4 of Stillwater Crossing covers over 12,240 square yards of concrete paving, utilizing Macomb County’s standard 7-inch concrete pavement section to create roadways for the new homes in the neighborhood.

What set this project apart was the establishment of an on-site concrete batch plant, allowing Florence Cement to produce and place over 2,380 cubic yards of concrete pavement while remaining isolated from existing residents in phases 1 and 2, as well as contractors working on homes in phase 3.

Florence Cement completed the majority of the 7-inch-thick, 28-foot-wide pavement using a slipform machine, with the remaining intersections placed by hand.