Location: 2425 Dixie Highway - Waterford
Concrete Contractor: Fessler & Bowman
Concrete Supplier: Van Horn Concrete
Prime Contractor: Reiner Construction
Design Engineer: EMH&T
Project Owner: Dayton Freight Lines, Inc.
Dayton Freight Lines is a leading provider of regional less-than-truckload (LTL) transportation services throughout the Midwest. This new Detroit Service Center will nearly double its size in the area.
This state-of-the-art building is conveniently located northwest of Detroit in Waterford Township. Built on 29 acres, the new Service Center will increase Dayton Freight’s capacity with 132 dock doors and an attached Repair Shop. Additional features include a snow scraper, secured parking, an outdoor patio, an irrigation system, and enclosed fueling.
The total duration was approximately 18 months. Van Horn Concrete supplied the 9-inch thick, basket-reinforced concrete for the parking lot and driveway, a total of 18,000 cubic yards was placed and finished by Fessler & Bowman crews.
© 2020 Michigan Concrete Association
Designed by InVerveMarketing.com